Los Angeles Bureau of Sanitation, CA
Pretreatment Information Management System
Industry: Wastewater
Challenge:
IPS personnel were responsible for the project management, development, and implementation services for a Pretreatment Information Management System to assist the City in tracking and monitoring more than 1,500 permitted industries.
Solution:
Project Highlights:
- Assessment of needs investigating all elements of the industrial pretreatment program and the business process employed by City staff.
- Definition of detailed specifications which outline the intended functionality and offer avenues of business re-engineering.
- Migration of historical data.
- Training.
- Long-term support of the application and its utilization.
Environmental Data Display (EDD) System
Industry: Wastewater
Challenge:
IPS personnel were responsible for the implementation of an EDD system to enhance the functionality and provide support to Regulatory Affairs Division personnel in making critical environmental watershed and water quality monitoring decisions by integrating data from a number of internal and external sources.
Solution:
Project Highlights:
- Development of documentation to support the implementation of an EDD system.
- Performance of a Needs Assessment, System Requirements Specifications, and System Design Documentation to procure and successfully implement an all-encompassing EDD.
Industrial Waste Billing System Study
Industry: Wastewater
Challenge:
IPS is responsible for the requirements gathering and specification necessary to consolidate the current Industrial Waste Billing System with Septage Waste and Groundwater billing operations, including the interface to PIMS and other City systems, current and future.
Solution:
Project Highlights:
-
Assessment of needs to define high level business requirements.
-
Prioritization and selection of best development alternative.
-
Review of possible integration points
-
Compilation of implementation path for various alternatives
Truck Weighing and Residuals Management System
Industry: Wastewater
Challenge:
IPS personnel were responsible for the replacement of combined legacy residuals management and truck scale system.
Solution:
Project Highlights:
-
Specification and implementation of commercial biosolids tracking software.
-
Specification and development of scale program interface for truck weight data
-
End user and administrator training
-
Specialty report development
-
Long-term support
Quality Assurance Oversight for the Solid Resources Citywide Recycling Division Data Management System Implementation
Industry: Wastewater
Challenge:
IPS is currently responsible for the audit of the selected vendor’s performance throughout the duration of the project to ensure that the Data Management System implementation meets its intended goals and is on schedule and within budget.
Solution:
Project Highlights:
- Review of the vendor’s Project Plan to provide feedback on scope, schedule, budget, resource requirements, roles, and responsibilities.
- Evaluation of the project deliverables to ensure compliance with the requirements and the Project Plan.
- Management of the project schedule and completion of tasks as planned, with a comprehensive monthly status report.
Wastewater Information System and Analytical Research Database Replacement
Industry: Wastewater
Challenge:
IPS was responsible for the pilot implementation of the Wastewater Information System and Analytical Research Database (WISARD) core replacement with a COTS product.
Solution:
Project Highlights:
- Recommendation of COTS product to manage and report all data necessary for treatment plant operations and data required for regulatory reporting.
- Management of COTS product implementation.
Landfill Inspection Study
Industry: Wastewater
Challenge:
IPS personnel were responsible for the analysis of needs related to tracking landfill inspection activities and assignment of work needs to applicable software alternative.
Solution:
Project Highlights:
-
Gap Analysis comparing landfill inspections to other (e.g., pretreatment, stormwater, etc.) inspection processes.
-
Review of available Bureau data systems capable of incorporating landfill inspection results.
-
Recommendation of alternatives for hosting landfill data.
Watershed Protection Information Management System
Industry: Wastewater
Challenge:
IPS personnel were responsible for the specification and development of a comprehensive Watershed Protection Information Management System to assist the Stormwater Management Division in its newly founded inspection program maintained details of all in-field and subsequent enforcement activities.
Solution:
Project Highlights:
- Review of business processes of all existing and proposed practices.
- Integration of a Laboratory Information Management System for sample tracking, a Geographic Information System for location assistance, and a Pretreatment Information Management System for a record of all industries in the community.
- Development of the following components: hotline, cost recovery, scheduling and contractor evaluation.
- Implementation on a wireless platform with thorough documentation and a sustainable training curriculum.
